Fortec Case Study GA Bridge Carbon Anchors

Fortec Case Study GA Bridge Carbon Anchors

Date: July 24, 2016

Location: Columbus Georgia

Contractor: Engineered Solutions

Project Scope: Concrete Bridge to be reinforced for traffic. Small concrete beams were under designed.

Solution: One layer 600 gsm carbon fiber with carbon anchors were installed to achieve this.

Conclusion: Testing of Anchors prove to dramatically increase long term creep of the surface mounted carbon fiber under the flexural load. Project was completed in 2 days.