Fortec Case Study retro fit remodel

Fortec Case Study retro fit remodel

Date: September 9, 2010
Structure: Brick Masonry unit Historical Building Storefront downtown Denver CO

Contractor: Pinnacle Structural Services
Engineer: EV Studio Architecture & Engineering
Material Used: 600 gsm Carbon Fiber w/#4550 Epoxy Resin

Project Scope: Retrofit building design for commercial use and wind load codes.

Solution: Carbon Fiber applied to strengthen and stabilization Retrofit walls in building as per Architect & Engineer design. Repair completed in less than a week allowing for next phase of remodel.

Fortec Case Study retro fit remodel Fortec Case Study retro fit remodel

Skills

Posted on

September 21, 2020