Fortec Case Study Teatro Verde

Fortec Case Study Teatro Verde

Date: April 22, 2010
Location: Teatro-Verde historical building. Toronto Ontario Canada
Contractor: Basement Technologies Inc ON
Engineer: Saberas Engineering

Material: Fortec 600gsm Unidirectional Carbon Fabric w/1276 epoxy resin

Scope: The Façade of building was desired to be preserved, while structure / building was in need of replacement. Carbon fiber was used to hold façade together as existing structure was removed. After new structure was completed the façade was moved into place to meet building.

Conclusion: The carbon fiber allowed for the removal of building without experiencing any major cracking of façade, thus preserving the historical value of the façade.

Fortec Case Study Teatro Verde Fortec Case Study Teatro Verde Fortec Case Study Teatro Verde