Date: August 12th 2017
Location: Medical College of Wisconsin Loading Dock
Contractor: Cornerstone Restoration
Engineer: N/A
Project Scope: Inadequate steel in loading dock concrete. Opening and closing of concrete caused severe cracking with vehicle traffic. Fortress Carbon Fiber Countersunk Staples were used along with epoxy injections to repair slab.
Conclusion: Staples with injection strengthened loading dock for future traffic. An overlay can now be used for aesthetics if desired.