Fortec Man Hole

Date: May 12, 2002
Structure: Sewer Man-hole, Sandusky, Ohio
Contractor: Lee Infrastructure Restoration
Engineer: Sandusky Water Works
Material Used: Fortec Carbon/Kevlar Grid
________________________________________
Project Scope:
Water infiltration, where brick tops jopin poured concrete, due to freeze/thaw and vibration. Standard repair materials failed over time.

Solution:
Fortec carbon was designed to make three monolithic to resist separation movement, thereby increasing life of the polyurethane grout and cematitious coatings.

Observations:
Sewer installs performed as designed, increasing the traditional water stop life.